Info iconThis preview shows pages 1–12. Sign up to view the full content.

View Full Document Right Arrow Icon
ppt-1/03-6198- 1 The Owner’s Influence on Construction Safety Performance Chapter 22
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
ppt-1/03-6198- 2 Types of Projects (59 Projects) Public 10.2% Private 89.8% Civil work 1.7% Commercial 6.8% Utilities 8.5% Manufacturing 32.2% Petrochemical 50.8% Combined 0.1% Maintenance 5% Unio n 32.2 % Mixed 35.6% Open Shop 32.2% Shutdown 0.1% Renovation 19% New 0.5%
Background image of page 2
ppt-1/03-6198- 3 Project Size and Safety Performance Avg. hours expended: 2.4 million hours Average project cost: $380 million Safety record: 1.95 TRIR Total Project Data Total project hours = 143 million hours Cost = $21 billion
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
ppt-1/03-6198- 4 1 Lost Time Injury 10 OSHA Recordables 300 First Aid ????? Near Misses
Background image of page 4
ppt-1/03-6198- 5 Findings Relationship of TRIR with: Project characteristics Selection of safe contractors Contractual safety requirements Owner’s safety involvement during project execution
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
ppt-1/03-6198- 6 Project Type
Background image of page 6
ppt-1/03-6198- 7 private public 1.62 3.16 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 TRIR Project Type Continued
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
ppt-1/03-6198- 8 design-build general contract 1.15 2.35 0.00 0.50 1.00 1.50 2.00 2.50 TRIR Project Type Continued
Background image of page 8
ppt-1/03-6198- 9 Project Type Continued All Others Shutdowns 1.80 2.91 0.00 0.50 1.00 1.50 2.00 2.50 3.00 TRIR
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
ppt-1/03-6198- 10 Project Type Continued Petrochemical Manufacturing 1.11 1.83 2.66 4.71 0.00 1.00 2.00 3.00 4.00 5.00 TRIR Excluding Shutdowns Shutdowns
Background image of page 10
ppt-1/03-6198- 11 Project Type Continued Open Shop Merit Shop Union 1.32 2.07 2.71 0.00 0.50 1.00 1.50 2.00 2.50 3.00 TRIR
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 12
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/27/2011 for the course BCN 4735 taught by Professor Staff during the Spring '08 term at University of Florida.

Page1 / 37

AChap22-Owner - Chapter 22 The Owners Influence on...

This preview shows document pages 1 - 12. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online