8’+ Sidewalk shed or canopy for entrance to building being demolished Width of canopy to be at least 2 feet wider than the entrance Canopy: capable of sustaining a 150 psf load Entrance Canopy on Multistory Bldgs
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Open Chutes 45° 4’opening (max) Chute must be enclosed if steeper than 45 degrees Keep closed if not in use Close off discharge area when not in use
Background image of page 2
Openings at Chutes 42” rail
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: When using mechanical equipment or wheelbarrows for dumping debris 4” wide 6” high Provide Bumpers Size of floor openings Area not to be greater than 25% of the total floor area Demolition Ball not to exceed 50% of crane rated load based on boom length and angle of operation, and not to exceed 25% of line strength Boom and load line: operate as short as possible...
View Full Document

This note was uploaded on 08/27/2011 for the course BCN 4735 taught by Professor Staff during the Spring '08 term at University of Florida.

Page1 / 6

Subpart-T - When using mechanical equipment or wheelbarrows...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online