Lecture-16

Lecture-16 - CEN4021 CEN4021 Monitoring(POMA Instructor...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
CEN 4021  CEN 4021   Software Engineering II  Software Engineering II Instructor: Masoud Sadjadi http://www.cs.fiu.edu/~sadjadi/ [email protected] Monitoring (PO M A)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
16 Lecture CEN 4021: Software Engineering II Acknowledgements Acknowledgements Dr. Onyeka Ezenwoye Dr. Peter Clarke 2
Background image of page 2
16 Lecture CEN 4021: Software Engineering II Agenda Agenda Monitoring (PO M A) Presenting and Communicating Data
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
CEN 4021: Software Engineering II Presenting and Communicating Data Presenting and Communicating Data Sharing Information The project status needs to be monitored by the managers gathered information needs to be shared with the team . The project team needs to be informed of the status and analysis of various parts of the project an informed team is much more motivated . Care must be taken not to overload team members with information. To achieve a balance, it is best to pick 3 or 4 measurements to
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 9

Lecture-16 - CEN4021 CEN4021 Monitoring(POMA Instructor...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online