CEN 4021  CEN 4021   Software Engineering II  Software Engineering II Instructor: Masoud Sadjadi http://www.cs.fiu.edu/~sadjadi/ [email protected] Adjustments and Actions (POM A )
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
17 Lecture CEN 4021: Software Engineering II Acknowledgements Acknowledgements Dr. Onyeka Ezenwoye Dr. Peter Clarke 2
Background image of page 2
17 Lecture CEN 4021: Software Engineering II
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
17 Lecture CEN 4021: Software Engineering II Agenda Agenda Adjustments and Actions (POM A ) Planned Unplanned
Background image of page 4
17 Lecture CEN 4021: Software Engineering II Adjustments and Actions Adjustments and Actions Software projects are subject to changes , imperfect planning, and necessary trade-offs. The manager should not be afraid to take action and make adjustments when necessary. Examples of staff beliefs and attitudes that may warrant change are: Believing or hoping that a problem will go away by itself Believing that making changes is a sign of weakness and lack of commitment Not realizing that changes and actions are needed
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
17 Lecture CEN 4021: Software Engineering II Adjustments and Actions Adjustments and Actions Being afraid of changes Not knowing what options are available and what adjustments to make If actions are not taken when needed, several unpleasant outcomes may result: Projects may fail Projects may barely get completed while taking a great toll on the organization
Background image of page 6
17 Lecture CEN 4021: Software Engineering II Adjustments and Actions Adjustments and Actions Adjustments are often necessary due to: Changing software requirements Discovery of an unfeasible design Loss of skilled team members Financial constraints It is very important to do a thorough risk analysis during the planning stage of the project.
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
17 Lecture CEN 4021: Software Engineering II Project managers must first recognize the need to take action and evaluate the risks of not taking action. It is essential to document why an adjustment is needed and the risk of not taking action. After an adjustment the
Background image of page 8
Image of page 9
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 22

Lecture-17 - CEN4021 CEN4021 Adjustments and Actions(POMA...

This preview shows document pages 1 - 9. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online