Lecture-19

Lecture-19 - CEN4021 CEN4021 SoftwareEngineeringII Change...

Info iconThis preview shows pages 1–8. Sign up to view the full content.

View Full Document Right Arrow Icon
CEN 4021  CEN 4021   Software Engineering II  Software Engineering II Instructor: Masoud Sadjadi http://www.cs.fiu.edu/~sadjadi/ sadjadi@cs.fiu.edu Change Control
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
19 Lecture CEN 4021: Software Engineering II Acknowledgements Acknowledgements Dr. Onyeka Ezenwoye Dr. Peter Clarke 2
Background image of page 2
19 Lecture CEN 4021: Software Engineering II Agenda Agenda Change Control
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
19 Lecture CEN 4021: Software Engineering II Change control Change control Software projects are prone to changes There is a general belief that software can be easily modified Changes must be implemented with care The worst situation occurs when changes are allowed without proper control
Background image of page 4
19 Lecture CEN 4021: Software Engineering II Change control Change control Definition A set of information and the sequence of activities used in the tracking and managing of a change request from its inception to its close.
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
19 Lecture CEN 4021: Software Engineering II Changes control Changes control The processes, methodologies and tools needed to manage change requests must be designed ahead of time . The process and people resources needed as part of the management of change request should be set aside, trained and include in the budget and plan .
Background image of page 6
CEN 4021: Software Engineering II Example change request process Example change request process Every change to product or process should start with a baseline which represents the first formally version. Then go through a change control process
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 8
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/29/2011 for the course CEN 4021 taught by Professor Staff during the Spring '08 term at FIU.

Page1 / 19

Lecture-19 - CEN4021 CEN4021 SoftwareEngineeringII Change...

This preview shows document pages 1 - 8. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online