MAINTENANCE OF TRAFFIC PHASE I PHASE II PHASE III PROJECT TOTAL DESCRIPTION UNITS UNIT PRICE QUANT. PRICE QUANT. PRICE QUANT. PRICE QUANT. PRICE Traffic Control Officer MH $33.00 32 $1,056.00 32 $1,056.00 64 $2,112.00 128 $4,224.00 Work Zone Signs ED $0.25 168 $42.00 9520 $2,380.00 1848 $462.00 11536 $2,884.00 Concrete Barrier Wall (Temporary, Type K) LF $16.00 1500 $24,000.00 3617 $57,872.00 5117 $81,872.00 Concrete Barrier Wall (Temporary) (Relocate) LF $3.20 1500 $4,800.00 2320 $7,424.00 3820 $12,224.00 Barricade (Type II or vertical panel) ED $0.20 6188 $1,237.60 4368 $873.60 10556 $2,111.20 Barricade (Type III) ED $0.50 252 $126.00 252 $126.00 High Intensity Flashing Lights ED $0.50 112 $56.00 2856 $1,428.00 504 $252.00 3472 $1,736.00 Reflective Pavement Markers EA $3.20 1082 $3,462.40 870 $2,784.00 1952 $6,246.40 Lights (Barrier Wall Mount, Type C, Steady Burn) ED $0.20 4200 $840.00 19516 $3,903.20 1176 $235.20 24892 $4,978.40 Attenuator Impact Vehicular (Temporary) LO $1,600.00 2 $3,200.00 2 $3,200.00 3 $4,800.00 7 $11,200.00 Sign. Variable Message ED $22.00 28 $616.00 476 $10,472.00 88 $1,936.00 592 $13,024.00 Steel Sheet Piling SF $7.00 5339 $37,373.00 5339 $37,373.00 Traffic Stripe Skip (10'-30', White) GM $500.00 0.41 $207.00 0.17 $83.50 0.58 $290.50 Traffic Stripe Solid (6" White) NM $800.00 1.71 $1,365.60 1.13 $907.20 2.84 $2,272.80 Traffic Stripe Solid (6" Yellow) NM $800.00 1.05 $836.80 0.76 $610.40 1.81 $1,447.20 $29,810.00 $129,593.60 $22,605.90 $182,009.50
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
DRAINAGE PHASE I PHASE II PHASE III PROJECT TOTAL DESCRIPTION UNITS UNIT PRICE QUANT. PRICE QUANT. PRICE QUANT. PRICE QUANT. PRICE Class I Conc. Endwall CY $750.00 19.61 $14,707.50 19.61 $14,707.50 Reinf. Steel Rdwy. LB $1.00 286 $286.00 286 $286.00 Barrier Wall Inlet (<10) EA $3,200.00 10 $32,000.00 10 $32,000.00 Barrier Wall Inlet (>10) EA $5,700.00 3 $17,100.00 3 $17,100.00 Manhole P-7 (<10) EA $2,000.00 4 $8,000.00 4 $8,000.00 Manhole P-7 (>10) EA $4,000.00 5 $20,000.00 5 $20,000.00 Manhole J-7 (<10) EA $5,000.00 2 $10,000.00 2 $10,000.00 Manhole J-7 (>10) EA $11,000.00 4 $44,000.00 4 $44,000.00 Gutter Inlet S (<10) EA $2,400.00 2 $4,800.00 5 $12,000.00 7 $16,800.00 Ditch Bottom Inlet G (<10) EA $5,600.00 4 $22,400.00 1 $5,600.00 5 $28,000.00 Ditch Bottom Inlet G (>10) EA $6,000.00 1 $6,000.00 1 $6,000.00 Ditch Bottom Inlet G w/J Bottom (<10) EA $8,000.00 2 $16,000.00 2 $16,000.00 Ditch Bottom Inlet G w/J Bottom (>10) EA $13,000.00 2 $26,000.00 2 $26,000.00 LF $187.00 1402 $262,174.00 1402 $262,174.00 Ditch Bottom Inlet D EA $2,400.00 1 $2,400.00 1 $2,400.00 2 $4,800.00 18" Optional Storm Sewer Pipe LF $39.00 584 $22,776.00 1332 $51,948.00 650 $25,350.00 2566 $100,074.00 24" Optional Storm Sewer Pipe LF $45.00 889 $40,005.00 889 $40,005.00 48" Optional Storm Sewer Pipe LF $91.00 1770 $161,070.00 1770 $161,070.00 24" Optional Cross Drain Pipe LF $210.00 16 $3,360.00 16 $3,360.00 18" Optional Gutter Drain Pipe LF $53.00 89 $4,717.00 99 $5,247.00 188 $9,964.00 Optional Side Drain Pipe (Elliptical) (29"x45")
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/29/2011 for the course CGN 4930 taught by Professor Prieto-portar during the Spring '11 term at FIU.

Page1 / 9

6-Cost-Estimate-Drainage - MAINTENANCE OF TRAFFIC...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online