7-Cost-Estimate-5story-bldg

7-Cost-Estimate-5story-bldg - General Requirements WBS...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: General Requirements WBS Divison Description 10100 10100 1 AE documents are prepared 10190 10000 1 Start 10110 10200 1 PM checks AE documents 10120 10300 1 County permit documents are prepared 10130 10400 1 Plans entered at County's Building Dept. 10140 10500 1 County's review 10150 10600 1 Receive, correct and resumit drawings 10160 10700 1 Receive ("pull") permit Subtotal for General Requirements Sitework WBS Divison Description 11830 20100 2 Mobilization (10% of project cost) 10200 20700 2 WATER LINE CONNECTION 10210 20800 2 SEWER LINE CONNECTION 10220 20900 2 STORM DRAIN Subtotal for Sitework Concrete WBS Divison Description Ground Floor 10280 30102 3 Assembly foundation reinforment 10290 30103 3 Build Framework 10300 30104 3 Cast Concrete 10330 30201 3 Column reinforcement 10350 30203 3 Beam Reinforcement 10850 30302 3 Column and beam pouring 10880 30304 3 Cast Concrete Second Floor 10920 30402 3 Column reinforcement 10341 30202 3 Assembly Framework 10351 30203 3 Beam Reinforcement 10851 30302 3 Column and beam pouring 10881 30304 3 Cast Concrete Third Floor 10921 30402 3 Column reinforcement 10342 30202 3 Assembly Framework Primavera Activity ID Primavera Activity ID Primavera Activity ID 10352 30203 3 Beam Reinforcement 10852 30302 3 Column and beam pouring 10882 30304 3 Cast Concrete Forth Floor 10922 30402 3 Column reinforcement 10353 30203 3 Beam Reinforcement 10413 30302 3 Assembly Framework 10863 30303 3 Reinforcement and forming Slab 10883 30304 3 Cast Concrete Roof 10923 30402 3 Column reinforcement 10344 30202 3 Assembly Framework 10354 30203 3 Beam Reinforcement 10854 30302 3 Column and beam pouring 10884 30304 3 Cast Concrete Subtotal for Concrete Masonry WBS Divison Description Second Floor 10900 30401 4 CMU Wall Third Floor 10901 30401 4 CMU Wall Forth Floor 10902 30401 4 CMU Wall Roof 10903 30401 4 CMU Wall Subtotal for Masonry Doors and Windows WBS Divison Description Second Floor 11013 80101 8 Doors 11023 80102 8 Windows Third Floor 11010 80101 8 Doors 11020 80102 8 Windows Forth Floor 11011 80101 8 Doors 11021 80102 8 Windows Roof 11012 80101 8 Doors 11022 80102 8 Windows Subtotal for Doors and Windows...
View Full Document

This note was uploaded on 08/29/2011 for the course CGN 4930 taught by Professor Prieto-portar during the Spring '11 term at FIU.

Page1 / 16

7-Cost-Estimate-5story-bldg - General Requirements WBS...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online