8-Cost-Estimate-7story-bldg

8-Cost-Estimate-7sto - ChadiKaram1933683( Activity Development:Financing Development:Contract Development:Office&Legals Design:Zoning

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Chadi Karam 1933683 (7 Story Luxury Residential Building) Activity Duration Cost (days) (USD) Development: Financing 10 50,000 Development: Contract 10 10 Design: Zoning 40 150,000 Design: Survey, Architectural 40 Design: Structural, Environmental 40 Design: Mechanical, Electrical 40 Procurement 180 350,000 Demolition 10 50,000 Excavation 5 40,000 Entire Structure 210 1,500,000 150 400,000 Finishes 150 808,000 Certificate of Occupancy 30 20,000 Project Duration 925 3,368,000 CashFLow Calculations Months Direct Cost Indirect Cost Subtotal Markup Total Billed 1 $56,818 $10,000 $66,819 $11,364 $78,183 2 $45,455 $10,000 $55,457 $9,091 $64,547 3 $56,818 $10,000 $66,821 $11,364 $78,185 4 $45,455 $10,000 $55,459 $9,091 $64,549 5 $56,818 $10,000 $66,823 $11,364 $78,187 6 $46,591 $10,000 $56,597 $9,318 $65,915 7 $53,030 $10,000 $63,037 $10,606 $73,643 8 $66,288 $10,000 $76,296 $13,258 $89,553 9 $53,030 $10,000 $63,039 $10,606 $73,645 10
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/29/2011 for the course CGN 4930 taught by Professor Prieto-portar during the Spring '11 term at FIU.

Page1 / 3

8-Cost-Estimate-7sto - ChadiKaram1933683( Activity Development:Financing Development:Contract Development:Office&Legals Design:Zoning

This preview shows document pages 1 - 2. Sign up to view the full document.