DAILY CONSTRUCTION REPORT Date: Day : PROJECT NAME: FIELD REP: PROJECT NUMBER: PROJECT MANAGER: CLIENT: DATE OF N.T.P.: CONTRACTOR: SUBSTANTIAL COMPLY: PROJECT DURATION: ORIGINAL CONTR. AMT: TIME EXTENSION: CHANGE ORDERS: DAYS USED: CONTR. AMT TO DATE: DAYS REMAINING: PAID THRU REQ. # 12 % TIME USED: % PAID % TIME REMAINING: % REMAINING WEATHER CONDITIONS TEMP: WIND: HUMIDITY: COMMENTS: OPERATIONS UNDERWAY & FACTS OBSERVED By: Distribution: 1. Project Manager(s) 2. Field Office 3. File 4. ClientPage _____ of _____
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
OPERATIONS UNDERWAY & FACTS OBSERVED (CONTINUED) Additional notes: PICTURES By: Distribution: 1. Project Manager(s) 2. Field Office 3. File
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 4. ClientPage _____ of _____ VISITORS/MEETINGS ON/OFF SITE TIME: NAME/COMPANY: TIME: NAME/COMPANY: TIME: NAME/COMPANY: TIME: NAME/COMPANY: CONTRACTOR & SUBCONTRACTORS ON SITE LABOR FORCES SUBCONTRACTOR LF SUBCONTRACTOR LF SUBCONTRACTOR LF TOTAL TOTAL MAJOR EQUIPMENT ON SITE Roller Backhoe Excavator Aerial Lift Mini excavator Load truck Dozer Crane Lift truck Concrete pump Wheel Loaders Fork lift By: Distribution: 1. Project Manager(s) 2. Field Office 3. File 4. ClientPage _____ of _____ By: Distribution: 1. Project Manager(s) 2. Field Office 3. File 4. ClientPage _____ of _____...
View Full Document

{[ snackBarMessage ]}