Project Chronology

Project Chronology - single vision 4 Design Development 30%...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
Project Chronology Pre construction Procurement Construction Phase Project Closeout 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Pre Construction Conceptual Planning Schematic Design Design Development Contract Documents 2
Background image of page 2
Conceptual Planning To proceed with project or not Select site Establish a program Conceptual estimate Master schedule Select designer and construction  manager 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Schematic Design 30% design completion Alternative design solutions Alternative materials and systems Value engineering Establish the work/bid package Long lead items Move into design development with a 
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
Background image of page 7
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: single vision 4 Design Development 30% to 60% design completion Evaluation and finalization of all architectural components and project systems Identifying potential contractors Preparing for necessary permits 5 Contract Documents Preparing working drawings and specs. Prepare owner estimate Cash flow analysis Constructability 6 Procurement Bidding and award Public advertisement/invite pre qualified contractors Review bids Select the best bid and award the contract 7...
View Full Document

This note was uploaded on 08/29/2011 for the course BCN 6518 taught by Professor Chini during the Spring '11 term at University of Florida.

Page1 / 7

Project Chronology - single vision 4 Design Development 30%...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online