spreadsheet for cost Masonry - 2

spreadsheet for cost Masonry - 2 - 32 M Joint reinforcing,...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
COST ESTIMATE SHEET Project: Small Commercial Building Sheet No.1/1 Location: Appendix A Date: Takeoff by: ARC Prices by: RS Means Checked by DESCRIPTION Quantity Unit Mat Cost Mat Cost Labor Cost Labor Cost Equip Cost Equ Cost Per Unit Extended Per Unit Extended Per Unit Extended Per Unit Extended Concrete block, back-up 8x16, non reinforced 8' thick 4287 SF Brick veneer, standard, select common
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 32 M Joint reinforcing, regular truss, galvanized 28.3 CLF Scaffolding, complete system for face of walls, material only, rent 2 months 51.41 CSF Labor to erect/dismantle scaffolding 1 to 5 51.41 CSF stories Mixer, 6 CF, rent 2 months 2 MON Mixer, operator cost 2 MON Forklift, 12' lift, 5000 lb, 2 wheel drive, gas 2 MON Forklift, operator cost 2 MON Total Cost Incl O&P...
View Full Document

Ask a homework question - tutors are online