{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

FINAL2 MC Answers

FINAL2 MC Answers - SE 660 Software Quality Engineering...

Info icon This preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
SE 660 Software Quality Engineering Final Exam INSTRUCTIONS: Thoroughly read each question before you attempt to answer it. There is a one-hour time limit for the exam. Each question is worth 10 points. This test is closed book and closed notes. As announced on the first day of class, the questions are based on information in the following texts: Paulk, Mark C. (1995). The Capability Maturity Model . Addison-Wesley: Boston, Mass. Pressman, Roger S. (2001). Software Engineering, A Practitioner’s Approach, 5th Edition. McGraw-Hill, Inc.: New York, NY. Grading is as follows: 285 - 300 = A 220 - 229 = C 270 - 284 = A- 210 - 219 = C- 260 - 269 = B+ 200 - 209 = D+ 250 - 259 = B 190 - 199 = D 240 - 249 = B- 180 - 189 = D- 230 - 239 = C+ 179 and below = Failed Return the exam with your answers to the exam administrator. GOOD LUCK!
Image of page 1

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
SE 660 Software Quality Engineering 1. Select the answer that most correctly matches the cost of correcting an error with the software development cycle. a) Development Test, 3 – 6 times b) Field operation, 100 – 600 times c) Design, 1 time d) Requirements, 15 - 40 times e) All of the above 2. Intergroup Coordination is part of which level in the CMM? a) Level 1 b) Level 2 c) Level 3 d) Level 4 e) Level 5 3. Verification: “Are we building the product right?” Validation: “Are we building the right product?” a) T b) F 4. Plans made in an organization at CMM level 2 show that the probability mean of Time/$ are usually higher than at Level 1. Why? a) The CMM model does not work for all organizations. b) Management will often overspent the savings realized at level 2 c) The planning in a level 2 organization is more accurate d) Managers in a level 2 organization spend more implementing CMM e) All of the above 5. Common features include a) Goals, Activities, Abilities, Verification b) Measurement, Abilities, Goals, Activities c) Commitment, Verification, Goals, Abilities d) Verification, Measurement, Abilities, Commitment e) All of the above 6.
Image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern