Ch8 - 8-1 a. product-level b. batch-level c....

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 8-1 a. product-level b. batch-level c. organization-sustaining activity d. organization-sustaining activity e. unit-level f. product-level g. batch-level h. organization-sustaining 8-3 1) $0.43/ square feet of lawn 2) $1.25/ square feet of low-maintenance beds 3) $3.20/ square feet of high-maintenance beds 4) $0.28/ mile 5) $290/ customer 8-9 Machine setups = 21,600 / 180 = $120/ number of setups Special processing = 180,000 / 4,000 = $45/ machine-hours General factory = 288,000 / 24,000 = $12/ direct-labor hours Rims: Machine setups = $120/ number of setups * 100 = $12,000 Special processing = $45/ machine-hours * 4000 = $180,000 General factory = $12/ direct-labor hours * 8,000 = $96,000 TOTAL = $288,000 Posts: Machine setups = $120/ number of setups * 80 = $9,600 Special processing = $45/ machine-hours * 0 = $0 General factory = $12/ direct-labor hours * 16,000 = $192,000 TOTAL = $201,600 Rims: Direct Materials: $17/ unit Direct Labor: $6.40/ unit Manufacturing Overhead: $14.40/ unit TOTAL = $37.80/ unit Posts: Direct Materials: $10/ unit Direct Labor: $3.20/ unit Manufacturing Overhead: $2.52/ unit TOTAL = $15.72/ unit ...
View Full Document

This note was uploaded on 08/30/2011 for the course ACG 2071 taught by Professor Smith during the Spring '07 term at University of Central Florida.

Ask a homework question - tutors are online