Gas in Peru-Abstract

Gas in Peru-Abstract - LTO llc Natural Gas Production in...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1 LTO, llc Natural Gas Production in Peru Group 1: Laura Causey Michael Eatmon Sara Habib
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2 Executive Summary Results The investment planning model for the Camisea natural gas reservoir in Peru, suggest that an initial investment of $2.475 billion on the natural gas plant plus $4.03 billion spent on the LNG and NG pipelines that connect the Camisea field with the plant location in Pisco, Peru will result in a net present value of $383.8 billion over the life span of the plant which is assumed to be 30 years. Initially, liquefied natural gas is sold to California and linear low-density polyethylene and Jet A jet fuel are created before the polyethylene is replaced with polyvinyl chloride in year 6 and Jet A is replaced with Diesel fuel in year number 8 Description of Project This project’s main goal is to determine the best investment plan for the natural gas reservoir located in the western part of Peru. The Camisea reservoir contains 11 trillion cubic feet of proven natural gas reserves. This reserve is large enough that no limits exist on the amount of
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/31/2011 for the course CHE 4273 taught by Professor Staff during the Spring '10 term at Oklahoma State.

Page1 / 2

Gas in Peru-Abstract - LTO llc Natural Gas Production in...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online