Accnt Hw P3-16 - $113,000 $72,000 $41,000 3000 13.67...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
1) March -  Cost of Goods Manufactured $168,000  Direct Materials $36,000  Direct Labor $60,000  Manufacturing Overhead  $72,000  June Cost of Goods Manufactured $257,000  Direct Materials $54,000  Direct Labor $90,000  Manufacturing Overhead  $113,000  2) high low change change in units variable cost/unit fixed cost
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: $113,000 $72,000 $41,000 3000 13.67 $(10,000) Manufacturing overhead = variable cost/unit * number of units produced + fixed cost 3) Direct Materials $42,000 Direct Labor $70,000 Manufacturing Overhead $105,666 Cost of Goods Manufactured $217,666...
View Full Document

{[ snackBarMessage ]}

Ask a homework question - tutors are online