Design Project Schedule (Summer 10)

Design Project Schedule (Summer 10) - EML2322L Design &...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
EML2322L – Design & Manufacturing Laboratory Design Project Schedule for Summer 2010 The purpose of this schedule is to provide a weekly guide for what you should be working on to remain on track for the design project in the course. You should average 6 hours of work each week outside class. LECTURE PROJECT ACTIVITY FOR THIS WEEK / WEEKEND DATE May 11 Read Design Project and Design Report Format handouts thoroughly Begin background information research Ask instructor/TAs for help as you have questions about the first report May 18 Complete the background information section of your report Begin the conceptual design drawings and written description Ask instructor/TAs for help as you have questions about the first report May 25 Complete the conceptual design drawings and written description Collaborate with your group on the Read the common mistakes section of the design report handout and avoid these errors Proof read all report sections or take them to the on-campus reading lab (grammar and spelling errors, formatting problems and messy work will be strictly penalized) M a k e photo copies of conceptual sketches for next week’s assignment (eval. matrices) Ask instructor/TAs for help as you have questions about the first report June 1 (*) Turn in first design report (promptly at beginning of lab period) Create evaluation matrices by comparing concepts Perform motor torque/speed calculations using lecture notes and handout Draw preliminary designs for motor mount brackets and wheel hubs using lecture notes from next week on mechanical power transmission. June 8 TA reviews evaluation matrices TA reviews motor torque/speed calculations and verifies final motor choices TA reviews motor mount and wheel hub designs / material selection Model & detail motors, wheels, motor mounts, wheel hubs & mobile platform Begin assembly model F i n i s h (bucket manipulator/hopper/filter) June 15 Bring completed detail drawings to lab to be checked Model & detail remaining items (specify mat’l, dimensions & tolerances) F i n i s h assembly model / drawings Finish remaining details for second report (individual part drawings, schedule/task list, bill of materials, budget and written description) Proof report; review task list to return prepared
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/05/2011 for the course EML 2322l taught by Professor Staff during the Spring '08 term at University of Florida.

Page1 / 3

Design Project Schedule (Summer 10) - EML2322L Design &...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online