chapter%20101 - CHAPTER 10 STANDARD COSTING A MANAGERIAL...

Info icon This preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
CHAPTER 10 STANDARD COSTING: A MANAGERIAL CONTROL TOOL DISCUSSION QUESTIONS 1. Standard costs are essentially budgeted amounts on a per-unit basis. Unit standards serve as inputs in building budgets. 2. Unit standards are used to build flexible budgets. Unit standards for variable costs are the variable cost component of a flexible budgeting formula. 3. Historical experience is often a poor choice for establishing standards because the his- torical amounts may include more ineffi- ciency than is desired. 4. Ideal standards are perfection standards, representing the best possible outcomes. Currently attainable standards are standards that are challenging but allow some waste. Currently attainable standards are often chosen because many feel they tend to mo- tivate rather than frustrate. 5. Standard costing systems improve planning and control and facilitate product costing. 6. By identifying standards and assessing devi- ations from the standards, managers can locate areas where change or corrective be- havior is needed. 7. Actual costing assigns actual manufacturing costs to products. Normal costing assigns actual prime costs and estimated overhead costs to products. Standard costing assigns estimated manufacturing costs to products. 8. A standard cost sheet presents the standard amount of and price for each input and uses this information to calculate the unit stand- ard cost. 9. Managers generally tend to have more con- trol over the quantity of an input used rather than the price paid per unit of input. 10. A standard cost variance should be investig- ated if the variance is material and if the be- nefit of investigating and correcting the devi- ation is greater than the cost. 11. Control limits indicate how large a variance must be before it is judged to be material and the process is out of control. Control limits are usually set by judgment although statistical approaches are occasionally used. 12. MPV is often computed at the point of pur- chase rather than issuance because it provides control information sooner. 13. Disagree. A materials usage variance can be caused by factors beyond the control of the production manager, e.g., purchase of a lower quality of material than normal. 14. Disagree. Using higher priced workers to perform lower skilled tasks is an example of an event that will create a rate variance that is controllable. 15. Some possible causes of an unfavorable labor efficiency variance are inefficient labor, machine downtime, and poor-quality materi- als. 16. A kaizen standard is the planned improve- ment for the coming period. Usually, Kaizen focuses on costs in the manufacturing sec- tion of the value chain. 17. Target costing is a cost management meth- od that is used to reduce costs to a level that reflects a product’s functions and mar- ket demands and management’s return re- quirements.
Image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern