AST-SEPT03-ERP-SES-05

AST-SEPT03-ERP-SES-05 - Session Plan and Coverage Steps in...

Info iconThis preview shows pages 1–15. Sign up to view the full content.

View Full Document Right Arrow Icon
    1 Session Plan and Coverage Steps in the MRP run Control parameters in the material master, in the BOM and in Customizing for MRP Net requirement calculation Lot-size calculation Scheduling BOM explosion and routing selection
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    2 Session Plan and Coverage At the conclusion of this unit, you will be  able to: Explain the individual steps of the MRP run Explain and apply the most important  parameters for the MRP run configuration  and their combinations.
Background image of page 2
    3 Course Overview R 1 Introduction 5 Master Production Scheduling Long-Term Planning 4 3 Demand Management Overview 2 7 Technical Information on How the Planning Run Works Discontinued Parts 10 9 Distribution Resource Planning Processing MRP Results 8 6 MRP Run
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    4 Steps in the Planning Run R BOM Explosion Scheduling Procurement Type Lot-Size Calculation Net Requirements Calculation 1 2 3 4 5
Background image of page 4
    5 Net Requirement Calculation R BOM Explosion Scheduling Procurement Type Lot-Size Calculation Net Requirements Net Requirements Calculation Calculation
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    6 Net Requirements Calculation in MRP R Requirements Requirements (Sales Sales orders orders , plnd plnd indep. reqmts, indep. reqmts, dependent dependent reqmts, reqmts, reservations , etc .) .) Fixed receipts E xample: purchase orders Firm planned orders Firm purchase requisitions Lot size Stock Shortage Comparision Safety stock Safety stock
Background image of page 6
    7 Net Requirements Calculation - Process R Reqmt Planned order Production order Available quantity for planning Time + - 0 Shortage quantity Shortage quantity Shortage quantity
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    8 How to Deal with Unforeseen  Developments in Requirement  Quantities? Safety stock Safety stock partially available Dynamic safety stock Safety time
Background image of page 8
    9 Safety Stock R Stock Time Safety stock (not available for planning) Available quantity for planning Reqmt Receipt
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    10 Safety Stock Partially Available R Time Stock Available quantity for planning Available portion of the safety stock for planning Portion of safety stock not available for planning Reqmt Receipt
Background image of page 10
    11 Range of Coverage Profile / Dynamic  Safety Stock (1) R Minimum stock Target stock Maximum stock Replenish to target stock Exception message Stock Stock (1)
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    12 Range of Coverage Profile / Dynamic  Safety Stock (2) R Reqmts Period 1 Period 2 Period 3 Period 4 Minimum stock Target stock Maximum stock Time Time Average daily requirements Average daily requirements Average daily requirements Stock (2)
Background image of page 12
    13 Range of Coverage Profile: Intervals R Interval 1 Interval 2 Interval 3 Minimum stock Target stock Maximum stock Reqmts Time Time
Background image of page 13

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
    14 Safety Time Time Safety time (in workdays) 03.28.
Background image of page 14
Image of page 15
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 49

AST-SEPT03-ERP-SES-05 - Session Plan and Coverage Steps in...

This preview shows document pages 1 - 15. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online