EC3 - Experiment EC3 RC-Circuits VI-2 The data for section...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Experiment EC3 RC-Circuits VI-2 – The data for section V-1 and V-2 is shown below. Using excel the data was graphed and with the Linest function slope was found and used to find the time constant. V-1 time (seconds) V-1 ln(V) (volts) V-2 time (seconds) V-2 ln(V) (volts) 10 0.334 10 0.281 20 0.284 20 0.165 30 0.226 30 0.057 40 0.176 40 -0.051 50 0.125 50 -0.163 60 0.070 60 -0.254 80 -0.045 70 -0.362 100 -0.154 80 -0.476 120 -0.247 90 -0.585 140 -0.358 100 -0.683 160 -0.467 110 -0.792 180 -0.573 120 -0.889 200 -0.675 130 -0.997 220 -0.783 140 -1.109 240 -0.892 150 -1.207 Slope -.005 Y int 0.388 160 -1.313 Uncertainty in slope 1.33E-05 Uncertainty in int 0.002 Slope -.010 Y int 0.0375 Uncertainty in slope 3.07E-05 Uncertainty in int 0.003 Slope = -1 therefore τ = - 1 τ S V-1 τ = -1 = 200 seconds
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
- .005 V-2 τ = -1 = 100 seconds -.010 VI-4 - In this section the data for V- 3 is shown below. Using excel the data was graphed and with the Linest function slope was found and used to find the time constant. V-3 time (seconds)
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 4

EC3 - Experiment EC3 RC-Circuits VI-2 The data for section...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online