draft bus project - INDE: 4331 ANALYSIS OF INDUSTRIAL...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Figure INDE: 4331 ANALYSIS OF INDUSTRIAL ACTIVITIES UNIVERSITY OF HOUSTON COUGAR LINE STUDY By: Thiago Menegon Mohamed Ait Aiss Janam Bhaukajee For the review of Dr. Schulze 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Table of Contents Abstract …………………………………………………………………………………………………… ……. 3 Introduction …………………………………………………………………………………………………. .. 4 Purpose ………………………………………………………………………………………………. 4 Problem ………………………………………………………………………………………………. 4 Scope …………………………………………………………………………………………………. . 5 Background ………………………………………………………………………………………………….…. 5 Methods …………………………………………………………………………………………. ……………… 8 Experimental design …………………………………………………………………………. . 11
Background image of page 2
Results ……………………………………………………………………………………………………. ……. 13 Green route ………………………………………………………………………………. ……… 14 Blue route ………………………………. ………………………………………………………… 16 Red route …………………………………………………………………………………………. . 18 Tan route …………………………………………………………………………………………. . 23 Purple route ……………………………………………………………………………. ………. . 25 Discussion ………………………………………………………………………………………….………… 27 Conclusion/Recommendation ………………………………………………………….…. . ……… 28 References …………………………………………………………………………………………………. . 32 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
In Analysis of Industrial Activities, a project was assigned with the purpose of studying the bus transportation services at the University of Houston, namely the Cougar Line. All bus routes were to be timed and analyzed for proper scheduling, and observations regarding driver’s behaviors and route utilization were necessary to achieve the objectives of developing suggestions on the existing system, and standards for work environment. Performing this project was necessary in order to make the system safer, reliable, predictable, and more beneficial to all users. Upon completion of data collection and analysis of the system, pictures were taken for visual aid, and improvement recommendations were developed. Introduction
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/11/2011 for the course INDE 3333 taught by Professor Sontag during the Fall '11 term at University of Houston.

Page1 / 36

draft bus project - INDE: 4331 ANALYSIS OF INDUSTRIAL...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online