COST ESTIMATE Length [m] Cost / m Cost total Concourse Tunnel Section (CTS-AH) 130 12,898 $ 1,680,240 $ Utility Room Section (URS) 151 7,062 $ 1,066,314 $ Entrance Tunnel Section (ETS) 200 7,261 $ 1,455,171 $ Cross Passage Section (CPS) 56 4,265 $ 239,375 $ Shafts 1 47 5,580 $ 262,256 $ TOTAL MATERIAL CONCOURSE LEVEL 4,703,356 $ MATERIAL PLATFORM LEVEL Length [m] Cost / m Cost total Platform Tunnel Section (PTS) 131 12,192 $ 1,599,637 $ Station Tunnel Section (STS) 255 4,648 $ 1,184,386 $ Cross Passage Section (CPS) 40 4,265 $ 171,183 $ Connector Tunnel Section (CONN) 106 7,240 $ 770,300 $ Entrance Tunnel Section (ETS) 70 7,261 $ 506,790 $ Running Tunnel Section (RTS) 80 7,788 $ not included Shafts 2 18 2,598 $ 46,769 $ TOTAL MATERIAL PLATFORM LEVEL 4,279,066 $ LABOR Duration [work days] Cost per work day Cost total Underground Excavation Unit 1 502 3,024 $ 1,518,048 $ Underground Excavation Unit 2 476 3,024 $ 1,439,424 $ Total Underground Excavation 978 2,957,472 $ Final Lining Unit 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 4

Prel-CostAnalysis-Tunnel - COST ESTIMATE MATERIAL CONCOURSE...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online