Timeline-for-SFR

Timeline-for-SFR - Single-Story Single Family Residence 02...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Single-Story Single Family Residence 02 September 2009 No. Activity Time Mgr. Start Actual 1 The Building Permit is Received 0 2 2 3 Excavate the foundation and set the formwork 2 4 Place the sand fill for the slab-at-grade 2 5 Order trusses - supply the supplier with drawings 1 6 Install the underground plumbing (stub-outs) 2 7 INSPECTION #1: Underground plumbing 2 8 Install the underground electrical 1 9 Install the underground A/C insulated conduits 1 10 INSPECTION #2: Underground electrical 2 11 Backfill utility trenches 1 12 Compact the slab's sand-fill base 1 13 Have a compaction test performed/reported by a testing lab 2 14 Spray the prepared sub-grade against termites 1 15 Lay out the plastic moisture membrane 1 16 Lay out the reinforcing steel for all foundations 2 17 INSPECTION #3: Foundations and slab-at-grade 2 18 Cast the concrete for the slab-at-grade 1 19 Place the masonry blocks upon the slab-at-grade 1 20 Finish placing all the block walls 2 21 Place the formwork for the tie-beams 3 22 INSPECTION #4: Tie-beam 2 23 2 24 Select and order windows 1 25 Cast the concrete for the tie-beams and reinf-masonry 1 26 Trusses delivered at job-site 1 27 Select and order the roof tiles
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/15/2011 for the course CCE 4001 taught by Professor Staff during the Spring '08 term at FIU.

Page1 / 3

Timeline-for-SFR - Single-Story Single Family Residence 02...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online