ASE 333T - CC Draft with Feedback

ASE 333T - CC Draft with Feedback - EvanCook DrewRosencrans...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Evan Cook Drew Rosencrans Isaac Hollkamp Jansen Jewell Colby Grace Team Sugar Water Purple Performance Contract  –  why performance instead of  collaboration? It’s fine, I’m just curious. Use this space for a mission statement and/or brief introduction. Face-to-Face Meetings Wednesdays at 8 o Pre-determined location and end-time   Will these vary?  When/how will they be determined? Sundays at 7 o Pre-determined location and end-time When Needed o When Agreed upon by group consensus Team Member Roles and Responsibilities –  The responsibilities, vis a vis the various  deliverables, in this section are fine as far as they go, but you need more specific  discussion of ROLES. Project Proposal – Decided as a group to divide the different aspects of the  project proposal between group members.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Exception: As a group we will write the Introduction,  schedule and conclusion together to maintain clarity and  continuity of the overall proposal. o Statement of the Project’s Purpose: Isaac and Colby o Problem Analysis and Approach: Jansen and Drew o  Literature Review: Evan At the completion of each of these individual aspects we  will revise and review them as a group. 
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/18/2011 for the course ASE 333T taught by Professor Wadbrook during the Fall '08 term at University of Texas at Austin.

Page1 / 6

ASE 333T - CC Draft with Feedback - EvanCook DrewRosencrans...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online