ASE 333T - Project Contract Rough Draft

ASE 333T - Project Contract Rough Draft - Evan Cook Drew...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Evan Cook Drew Rosencrans Isaac Hollkamp Jansen Jewell Colby Grace Team Sugar Water Purple Performance Contract Face-to-Face Meetings Wednesdays at 8 o Pre-determined location and end-time Sundays at 7 o Pre-determined location and end-time When Needed o When Agreed upon by group consensus Team Member Roles and Responsibilities Project Proposal – Decided as a group to divide the different aspects of the project proposal between group members. Exception: As a group we will write the Introduction, schedule and conclusion together to maintain clarity and continuity of the overall proposal. o Statement of the Project’s Purpose: Isaac and Colby o Problem Analysis and Approach: Jansen and Drew o Literature Review: Evan
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
At the completion of each of these individual aspects we will revise and review them as a group. Final Report - Decided as a group to divide the different aspects of the final report between group members. o
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/18/2011 for the course ASE 333T taught by Professor Wadbrook during the Fall '08 term at University of Texas at Austin.

Page1 / 5

ASE 333T - Project Contract Rough Draft - Evan Cook Drew...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online