Note_About_Milestone_3

Note_About_Milestone_3 - All EngE 1104 Students I have been...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
All EngE 1104 Students, I have been getting some good questions about Milestone 3, so I want to send out some clarifications and some pointers. First, as stated in the syllabus, all three parts of Milestone 3 are due on Tuesday the 27, and just as with your other project assignments, it is due before the beginning of class time, and it must be uploaded by all team members. Second, I want to talk about "high-level" / "systems level" decisions and "systems level" metrics. At this point, as engineers, it is absolutely critical that you "zoom outward" and look at the "big picture" and consider many extremely different potential solutions. For example, I have been asked whether or not a particular project topic requires the development of a hardware component or only a software component, but actually, that is exactly the type of thing that your systems level metrics need to be measuring. So at this level, a good metric would be of the form: "Hardware requirement (any cell phone, any cell phone / pda combo, a proprietary portable
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 2

Note_About_Milestone_3 - All EngE 1104 Students I have been...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online