matrix - -S + Safety (incidents/yr) 17 + + + Capacity...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
Weight Aesthetic Rating Enviromental Impact Travel Time Material Cost Usability Shut-down time Looks Good 5 X Low Emissions 15 X Fast 15 X Easy Access 10 X Cheap 10 X Always Running 15 X Low Wait Time 10 X Safe 15 100 >6 Units rank minutes $ % students Costomer  Needs CO2 per  mile hours per  day
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Incidents Current Monorail Perimeter Bus Tunnels Perimeter Parking 2-way Bus 3 5 4 2 5 3 2 4 3 5 5 2 3 5 2 3 2 4 5 4 4 3 3 4 4 3 4 3 2 3 2 5 2 5 5 2 2 4 3 5 5 4 X 3 3 3 4 4 3 Total incidents  per  year
Background image of page 2
Current Monorail Perimeter Bus Tunnels Perimeter Parking 2-way Bus 15 25 20 10 25 15 30 60 45 75 75 30 45 75 30 45 30 60 50 40 40 30 30 40 40 30 40 30 20 30 30 75 30 75 75 30 20 40 30 50 50 40 45 45 45 60 60 45 275 390 280 375 365 290
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Pugh Matrix Criteria Current Bus Monorail Not Operating (hr/day) 6 + S + wait time (min) 8 + - + Accessable to all (% of student body) 100 S S S Number emissions (grams/mile 6.22 + S + Travel Time (min) 8 + + + Cost for student use ($/yr) 0 S S S Cost to Run ($/yr) 10.1 million
Background image of page 4
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 6
Background image of page 7
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: -S + Safety (incidents/yr) 17 + + + Capacity (people/trip) 70 + S + Perimeter Bus Above Ground Tunnels + + + +-S + S + + S S--+-+ + Perimeter Parking 2-Way Bus Route Pugh Matrix Criteria Current Bus Monorail Not Operating (hr/day) 6 + S + wait time (min) 8 +-+ Accessable to all (% of student body) 100 S S S Number emissions (grams/mile 6.22 + S + Travel Time (min) 8 + + + Cost for student use ($/yr) 0 S S S Cost to Run ($/yr) 10.1 million-S + Safety (incidents/yr) 17 + + + Capacity (people/trip) 70 + S + Perimeter Bus Above Ground Tunnels + + + +-S + S + + S S--+-+ + Perimeter Parking 2-Way Bus Route...
View Full Document

This note was uploaded on 09/20/2011 for the course ENGINEERIN 131 taught by Professor Karnes during the Spring '11 term at Purdue University-West Lafayette.

Page1 / 7

matrix - -S + Safety (incidents/yr) 17 + + + Capacity...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online