lec3-2 - MIE 350 Project Initiation Staffing Planning...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
MIE350: Software Development Methodologies 1 MIE 350 Planning Michael Gruninger Information Engineering Centre [email protected]
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
MIE350: Software Development Methodologies 2 Software Processes • Software processes are sets of activities that lead to the production of software. • Increasingly, software is developed by extending and modifying existing systems and by configuring and integrating off-the-shelf software or system components.
Background image of page 2
MIE350: Software Development Methodologies 3 Outline • System Request • Feasibility Analysis – Is it worthwhile to build the system? • Estimating Project Size • Estimation is hard • Staffing
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
MIE350: Software Development Methodologies 4 Beware 3 that I am not addressing here – You are responsible for it all unless otherwise noted – Don’t worry about the details of economic feasibility: understand the concept
Background image of page 4
MIE350: Software Development Methodologies 5 System Request • A document describing why a system is needed • What are the business reasons for project and system’s expected value – New inventory tracking system will reduce our costs by 20% and increase on-time delivery by 5% – New shift scheduling system will decrease absentees by 15%
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
MIE350: Software Development Methodologies 6 Elements of a System Request • Project sponsor • Business need • Business requirements • Business value • Special issues or constraints
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 25

lec3-2 - MIE 350 Project Initiation Staffing Planning...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online