IvanRivera6--MM305_Unit7_Project

IvanRivera6--MM305_Unit7_Project -...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MM305 Quantitative Analysis for Managers Unit 7 Project Please download this document to your computer and save it using the naming  convention specified in the course syllabus.  After completing and saving the project  problems, submit your project in the Drop Box for Unit 7. 1.  The following represents a project with known activity times. All times are in weeks. Activity Immediate  Predecessor Time A - 4 B - 3 C A 2 D B 7 E C, D 4 F B 5   a. What is the minimum possible time required for completing the project?  Minimum time for the project is 14weeks b. What is the latest possible time that Activity C may be started without delaying the  completion of the project? This Activity C can be held for about 8 weeks c. What is the slack time for Activity D?   The slack time for D is zero it can begin as soon as B is complete any delay will hold process E d. What is the latest finish time for Activity E?    
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/22/2011 for the course ACCOUNTING MT482 taught by Professor Das during the Spring '11 term at Kaplan University.

Page1 / 2

IvanRivera6--MM305_Unit7_Project -...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online