Report of Engineering Survey.docx - Cheng Shiu University 2020[Date Report of Engineering Survey(Forward and Side Intersection Method Student ID

Report of Engineering Survey.docx - Cheng Shiu University...

This preview shows page 1 - 8 out of 18 pages.

[Date] Student ID : K0835105 Name : Andhira Fajrina Bidari ( 貝迪拉 ) Instructor : Chen-Hoang Lo Cheng Shiu University 2020 Report of Engineering Survey (Forward and Side Intersection Method)
Image of page 1
SECTION I Introduction to the Study 1. 1 Forward and Side Intersection Method After the length of the curve (L) and the semi-tangent length (T) have been computed, the curve can be stationed. When the station of the PI is known, the PC station is computed by subtracting the semitangent distance from the PI station. (Do not add the semi-tangent length to the PI station to obtain the PT station. This would give you the wrong value) Once the PC station is determined, then the PT station may be obtained by adding L to the PC station. All stationing for control is stated to one hundredth of a foot. Points should be set for full stations and at half station intervals. Full stations are at 100 ft intervals and half station intervals are at 50 ft. (10+00.00). 1. Forward Intersection Method Measuring the horizontal angle (α & β) at two known triangulation stations (A & B) to calculate the coordinate of the unknown point (P). 2. Side Intersection Method Measuring the horizontal angle (α & β) at one of the known triangulation stations (A or B), and measuring the horizontal angle (γ) at the unknown point (P), to calculate the coordinate of the unknown point (P).
Image of page 2
1. 2 The Member of Our Group Our Team Member of Our Team
Image of page 3
Name : Andhira Fajrina Bidari 貝迪拉 Student ID : K0835105 Name : Reka Prinsiska 雷妃卡 Student ID : K0835116
Image of page 4
Name : Shanny Septiyani 薛晴 Student ID : K0835117 Name :Imam Hadi Wijaya 何政
Image of page 5
Student ID : K0835124 Name : Seybett Serutti 蘇芮帝 Student ID : K0835130 Name : Yusman S foenay 尤曼
Image of page 6
Student ID : K0835131 SECTION II Procedure and Record of Observation 2. 1 Stake Out Forward and Side Intersection Method Differential Leveling 2. 1.1 Levelling Equipment These are the levelling Equipment that we use to get a forward and side intersection method data: 1. T heodolite otal Station
Image of page 7
Image of page 8

You've reached the end of your free preview.

Want to read all 18 pages?

  • Summer '17
  • jane
  • Surveying, theodolite, Side Intersection Method

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes