extra credit

extra credit -...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ACC Managerial Accounting:  Extra Credit Assignment #4 Flexible Budget Performance Report and Variance Analysis This assignment  will not  be done through Cengage Now.  It must be completed using Excel, a  spreadsheet application.  No handwritten work will be accepted.  A printed copy of the  assignment is due at the beginning  of your class period on Monday, November 29th.  No work  will be accepted late or via e-mail.  The assignment is worth 5 points for work completed  accurately and according to the directions.  List and detail each step.  You must show and  label all your work.  Just providing the final result will not result in full credit.  Complete a performance report for an activity level of 18,000 Units.  The budgeted costs are  provided in the table below for two different activity levels. Actual Costs
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/29/2011 for the course ACC 2362 taught by Professor Thoede during the Fall '07 term at Texas State.

Page1 / 2

extra credit -...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online