F-4PROCEDURE - each flowmeter, 5 readings were taken at...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
PROCEDURE: The pump tank was filled with water, monometer was connected to the flowmeter selected to study. The pump was operated against a closed valve, then slowly the valve was opened and the flow rate was sated. For
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: each flowmeter, 5 readings were taken at different flow rates and at the same time the manometer readings were taken. We used the same procedure fore the other flowmeters....
View Full Document

Ask a homework question - tutors are online