Summary of List Variation Order (VO) April 2019 CONTRACT VALUE : RM 199,500,000.00 ITEM DESCRIPTION ZRR ESTIMATE DK CONSULTANT REMARKS/ JUSTIFICATION (RM) (RM) COLLECTION PAGE : PAGE 1 (1,363,270.05) 531,847.11 CADANGAN PEMBANGUNAN KOMERSIL YANG MENGANDUNGI :- FASA 1: (I) 1 TINGKAT RUANG TEMPAT LETAK KERETA SUB-BESMEN (II) 4 TINGKAT RUANG PERNIAGAAN (III) 1 UNIT PENCAWANG ELEKTRIK (IV) 1 UNIT PUSAT PEMBUANGAN SAMPAH (V) 2 TINGKAT RUANG TEMPAT LETAK KERETA PODIUM FASA 2: (I) 1 BLOK SOHO 22 TINGKAT (352 UNIT) (II) 1 TINGKAT RUANG KEMUDAHAN (III) 4 TINGKAT RUANG TEMPAT LETAK KERETA PODIUM (IV) 1 UNIT KOLAM RENANG FASA 3: (I) 1 BLOK SOHO 22 TINGKAT (352 UNIT) DI ATAS LOT 49371 (PT 68975-C5), BANDAR BARU BANGI, MUKIM KAJANG, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN.
Image of page 1
TOTAL OMMISION/ADDITION TO CONTRACT (1,363,270.05)
Image of page 2
Summary of List Variation Order (VO) DECEMBER 2019 CONTRACT VALUE : RM 199,500,000.00 ITEM NO OF V.O DESCRIPTION ZRR ESTIMATE DK CONSULTANT REMARKS/ JUSTIFICATION (RM) (RM) 1 V.O No. 5 (1,249,360.00) (53,984.42) 2 V.O No. 7 UPGRADING THE EXISTING HOARDING - 20,289.73 3 V.O No. 34 ADDITIONAL ALUMINIUM COLUMN CLADDING - 546,269.81 4 V.O No. 62 - 96,287.80 5 (16,796.78) (30,512.93) 6 (36,820.89) (37,407.68) 7 (60,292.38) (9,095.20) CADANGAN PEMBANGUNAN KOMERSIL YANG MENGANDUNGI :- FASA 1: (I) 1 TINGKAT RUANG TEMPAT LETAK KERETA SUB-BESMEN (II) 4 TINGKAT RUANG PERNIAGAAN (III) 1 UNIT PENCAWANG ELEKTRIK (IV) 1 UNIT PUSAT PEMBUANGAN SAMPAH (V) 2 TINGKAT RUANG TEMPAT LETAK KERETA PODIUM FASA 2: (I) 1 BLOK SOHO 22 TINGKAT (352 UNIT) (II) 1 TINGKAT RUANG KEMUDAHAN (III) 4 TINGKAT RUANG TEMPAT LETAK KERETA PODIUM (IV) 1 UNIT KOLAM RENANG FASA 3: (I) 1 BLOK SOHO 22 TINGKAT (352 UNIT) DI ATAS LOT 49371 (PT 68975-C5), BANDAR BARU BANGI, MUKIM KAJANG, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN. OMISSION OF GLASS DOOR AND SCREEN W43 AT SHOWER AREA (SHOWER SCREEN) UPGRADING THE CEILING FINISHES AT GROUND FLOOR MAIN ENTRANCE GLASS RAILING (STAIRCASE FINISHES at SOHO Tower A and B) - 3mm thick stainless steel top rail STAINLESS STEEL WALL MOUNTED HAND RAILING
Image of page 3
Image of page 4

You've reached the end of your free preview.

Want to read all 10 pages?

  • Summer '20

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture