MOD3_PROJECT_ONE_INSTRUCTIONS

MOD3_PROJECT_ONE_INSTRUCTIONS - ACC331GroupProjectOne

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ACC 331 Group Project One       Each student will pick one partner to work on the  group projects .  You must let me know  who the team is in module one.  Once a team of two is picked, you must stay with that team  through project one.      You can change teams for project two but must let me know by module four who the new two  person team is, and if you have changed, let your old teammates know.          Project one  will cover the  operating and cash budgets (chapter nine) .  If an odd number  of students are in the class, one team may end up with three partners.  One of the three will be  assigned to another group for the second project.         Working in a group is part of what is done in the real business world.  It will require each  partner emailing work back and forth by email or going into the chat room to discuss their paper.  Some times student drop before the course is over.  If your partner drops you still have to  complete the project.  You will have a chance to get a new partner before the next project starts.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 09/29/2011 for the course ACC 311 taught by Professor Hiles during the Spring '11 term at University of Phoenix.

Page1 / 3

MOD3_PROJECT_ONE_INSTRUCTIONS - ACC331GroupProjectOne

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online