Group10 Topic C

Group10 Topic C - 1 ISE 441 Engineering Project Management...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1 ISE 441 Engineering Project Management Group 10 2 Scenario Eddie is promoted to section supervisor in charge of scheduling the priorities of new engineering research laboratory Gary is the department manager who think Eddie should handle all the problem himself. Eddies Decision Still ask for Gary opinion even Gary not intended to interfere Irresponsible to transfer his duty to Gary, where he assigned Eddies work Eddie put a signature block under his for Gary to sign 3 Impact of Eddies decision Eddie will be condemned by all the upper sections The laboratory schedule will be affected as Gary would not take part in Eddies job 4 5 Key Issue-1 Eddie has full authority on the scheduling It is not appropriate for the scheduling of laboratory to be in charged by a section supervisor of Manufacturing Division 6 Key Issue-2 Im having a hell of time trying to satisfy all of the department managers. Eddie said He found difficulty in cooperating with different department managers and to satisfy them at the same time. 7...
View Full Document

Page1 / 19

Group10 Topic C - 1 ISE 441 Engineering Project Management...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online