{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

AirplaneGame050511

AirplaneGame050511 - The Airplane Game An exercise in...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
The Airplane Game An exercise in production system design
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Phase 1 Logistics Workstations in work flow sequence Materials located at workstation Workstations 2-5 have an incoming queue space Completed batches of 5 placed in queue space of next station Batches remain together until final inspection
Background image of page 2