UGBA M2L3 - UGBA M2L3 Which involves lead time Registering...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
UGBA M2L3 Which involves lead time? Registering for classes PERT- program evaluation and review technique. What does GANTT stand for? Nothing- it’s named for Henry Gantt, the inventor Manufacturing- project management More complex projects PERT charts Stands for Program Evaluation and Review Technique (sometimes called “ Critical Path Method” ) 1. Well-defined sub-tasks 2. Tasks can be started and stopped separately 3. Tasks are ordered (in sequence) Constraints= things must be done in a certain order Tech terms. “Slack” means when we have some flexibility Sum of the nodes on the critical path Cost calculations – to show effect of time/cost tradeoffs Rough framing is constrained by the foundation (b is constrained by a) There is slack at c g- end = critical path Site Selection Natural resources (e.g. iron ore) Utilities and transportation Labor Available, cheap
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 2

UGBA M2L3 - UGBA M2L3 Which involves lead time Registering...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online