L11 Notes_Part_17 - 6.2 8.2 10.1 80 3.7 5.8 7.7 9.5 Actual...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Attribute Sampling Example Part of the table used to determine the computed upper deviation rate at 95% desired confidence level: Sample Size 0 1 2 3 25 11.3 17.6 - - 30 9.5 14.9 19.6 - 35 8.3 12.9 17.0 - 40 7.3 11.4 15.0 18.3 45 6.5 10.2 13.4 16.4 50 5.9 9.2 12.1 14.8 55 5.4 8.4 11.1 13.5 60 4.9 7.7 10.2 12.5 65 4.6 7.1 9.4 11.5 70 4.2 6.6 8.8 10.8 75 4.0
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 6.2 8.2 10.1 80 3.7 5.8 7.7 9.5 Actual Number of Deviations Found Attribute Sampling Example Tolerable Deviation Rate (6%) Computed Upper Deviation Rate (8.2%) < Auditor’s Decision: Does not support reliance on the control. Evaluate Sample...
View Full Document

Page1 / 3

L11 Notes_Part_17 - 6.2 8.2 10.1 80 3.7 5.8 7.7 9.5 Actual...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online