KIC000015 - H.W.#7 Con E 441 Primavera SureTrak 3.0c...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
H.W.#7 Con E 441 Primavera SureTrak 3.0c Scheduling Problems (20 pts.) Due: P20 - Thursday, October 7, 2010 @ 10:00 AM INDIVIDUAL HOME WORK PROBLEMS Prepare a CPM schedule using the logic as shown for both exercises nos. 9 10 (see attached PDM diagrams). Use a START MILESTONE to begin the project, and a FINISH MJLESTONE to complete the project. Include LAG relationships as shown. Print a BAR CHART format schedule (landscape orientation on Letter size paper) with the following columns of information shown on the left side (left to right order to match this list, adjust column widths as required to show all data in columns), and the bar chart schedule on the right side: Activity ill Activity Description Original Duration Remaining Duration Actual Duration Early Start Early Finish Late Start Late Finish Predecessor Successors Free Float Total Float I. Use default settings for BAR FORMATS (critical path bars are RED, non-critical path bars are GREEN, etc . .. ) Color prints outs are reqnired. 2.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/12/2011 for the course CON E 421 taught by Professor Jaselskis during the Fall '10 term at Iowa State.

Page1 / 2

KIC000015 - H.W.#7 Con E 441 Primavera SureTrak 3.0c...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online