Extra+Credit+_2+Normal+_+ABC+Costing+F11-1

Extra+Credit+_2+Normal+_+ABC+Costing+F11-1 - ACC Managerial...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: ACC Managerial Accounting: Extra Credit Assignment #2 Job Order Costing (Normal Costing) and Activity Based Costing This assignment will not be done through Cengage Now. It must be completed using Excel, a spreadsheet application. No handwritten work will be accepted. A printed copy of the assignment is due at the beginning of your class period on Monday, October 3rd. No work will be accepted late or via e-mail. The assignment is worth 5 points for work completed accurately and according to the directions. List and detail each step. You must show and label all your work. Just providing the final result will not result in full credit. Ramsey Company produces speakers (Model A and Model B). Both products pass through two producing departments. Model As production is much more labor-intensive than that of Model B. Model B is also more departments....
View Full Document

This note was uploaded on 10/13/2011 for the course ACCT 2361 taught by Professor Severance during the Spring '08 term at Texas State.

Page1 / 2

Extra+Credit+_2+Normal+_+ABC+Costing+F11-1 - ACC Managerial...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online