Chapter 16 answers - total cost of this job for Chandler...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Aaron New ACC 240 – Section 33858 Sep 5, 2010 Chapter 16 assignment PE 16–15 Calculating Predetermined Overhead Rates Calculations: 1,600,000/250,000 = $6.40 per hour Answer: $6.40 per hour E 16–37 Applying Overhead 1. Calculations: (2,500+19,000+130,000)/15,000= $10.10 per hour Answer: $10.10 per hour 2. If Brown School actually used 250 instructor hours and $1,200 in materials for a job for Chandler High, what are the allocated overhead cost and the
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: total cost of this job for Chandler High? DM = $1200 Calculations DL = $4667 Calculations OH = 10.10x250=$2525 Calculations Total = $8,392 PE 1638 Service Costs 1. Overhead rate = $6,200,000/150,000= $41.33 per consulting hour 2. DM $4,000 DL $500 OH $41.33x100= $4,133 Total cost = $8,633...
View Full Document

Ask a homework question - tutors are online