412xFin10F-PMdataEmail

412xFin10F-PMdataEmail - Run the data on the...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
LastName FirstName Fall 2010 Last 4 digits SFSU ID# (1 digit per cell) Project Management Data (KRM) Task PredecessorOptimistic LikelyPessimisticNorm$ CrashTimeCrash$ A None 1 4 7 1000 3   B None         4 2000 C None       2000 4   D A         5 1400 E B 3 3 3   2 1100 F C       2500 6   G D,E         3 1450 H F,G 3 3 3 300 1  
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
INSTRUCTIONS Download this spreadsheet to your computer or flash drive Open the spreadsheet Do the following on the worksheet labelled Final before printing Type your Last Name in cell A2 and First Name in cell C2 Type the last 4 digits of your SFSU ID# in cell A5, B5, C5, D5 (one digit per cell) At this point you may print out the spreadsheet (use landscape format)    and use a calculator to prepare for the exam    OR you may add columns and/or rows to input formulas you need and print later.  Assume that Normal Time is the same as Expected Time. 
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Run the data on the "Final" worksheet using MS Project. Use Expected Time as the Duration for each task. Assume the project starts on Tuesday, January 4 2011, all times are in days, and people do not work on weekends. Print out the Network Diagram and Gantt Chart from MS Project and bring to the exam. Things you may want to calculate prior to exam - not necessarily a complete list Expected times for each task Variance of time for each task Standard deviation of time for each task Expected time for each path Variance of time for each path Standard deviation of time for each path Maximum crash time for each task Crash cost per day for each task Early start, early finish, late start, late finish for each task...
View Full Document

Page1 / 2

412xFin10F-PMdataEmail - Run the data on the...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online