MRP(2,18) - MATERIALS REQUIREMENT PLANNING

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
MATERIALS REQUIREMENT PLANNING MRP is designed to answer three questions: -What is needed? -How much is needed? -When is it needed? 1 Master  Production  Schedule Product  Structure  Diagram Inventory  Records MRP  Computer Requirements for  Raw Materials Detailed Shop Floor  Schedule Inventory  Transactions MRP Inputs MRP Processing MRP Outputs
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
MRP INPUTS 1. Master Production Schedule: - Master production schedule specifies how much of each product to make  in a specific period - Input: Forecasted Demand weeks 1 2 3 4 5 6 7 8 Item X - - - 100 - - - 100 Question:  Where do these quantities come from?  2
Background image of page 2
2. Product Structure Diagram  Product Structure diagram refers to the relationship between the components  at adjacent levels of the system  Bill of Material (BOM) Listing of all assemblies, subassemblies, parts, and raw materials  that are needed to produce one unit of a finished product.  3 END ITEM ITEM A (2) 1 week  ITEM B (1) 2 weeks ITEM C (1) 2 weeks  ITEM D (2) 1 week  ITEM C (2) 2 weeks  ITEM E (3) 2 weeks 
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Example:  Consider the following product structure diagram and  determine the quantities of each item that will be required to assemble 200 of  item x.  Solution:      Quantity Quantity Component       per 1 X per 200X 4  ITEM X B (2) C (1) D (3) E (1) E (2) F (2) E (4)
Background image of page 4
3. Inventory Records:
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/08/2011 for the course IE 383 taught by Professor Leyla,o during the Spring '08 term at Purdue.

Page1 / 14

MRP(2,18) - MATERIALS REQUIREMENT PLANNING

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online