28_paCh04-Assembly Lines STU 2011

28_paCh04-Assembly Lines STU 2011 - Example Example A...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
xample Example A manual assembly line is being planned to produce a small consumer ppliance The work elements element times and precedence constraints appliance. The work elements, element times, and precedence constraints are indicated in the table on the next page. The workers will work for 420 min/shift and must produce 350 units/shifty. A mechanized conveyor, moving at a speed of 1.4 m/min will transport work units through stations. gp p g Manning level is 1.0, and repositioning time is 0.1 min. Because worker