6 - components are positioned in a jig, which is placed in...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Production Process All three clubs (drivers, wedges, and putters) use the same manufacturing process. Each of the three clubs use between 5 and 10 components. A component is a precisely machined piece of steel, brass, or titanium that Walsh buys from outside suppliers. The
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: components are positioned in a jig, which is placed in a specially designed computercontrolled machine. This machine first heats the components to a very high temperature that fuses them together, then cools them, and polishes the finished club....
View Full Document

This note was uploaded on 10/18/2011 for the course ACC 321 taught by Professor Frankel during the Spring '11 term at Central Mich..

Ask a homework question - tutors are online