FCFS Job time Flow Time Due date Tardiness Job (days) (days) A 14 14 20 0 B 10 24 16 8 C 7 31 15 16 D 6 37 17 20 sum 37 106 44 Average FT 26.5 Average Tardiness 11 Makespan 37 Average WIP 2.8648648649 SPT D 6 6 17 0 C 7 13 15 0 B 10 23 16 7 A 14 37 20 17 37 79 68 24 Average FT 19.75 Average Tardiness 6 Makespan 37 Average WIP 2.1351351351 EDD C 7 7 15 0 B 10 17 16 1 D 6 23 17 6 A 14 37 20 17 37 84 68 24 Average FT 21 Average Tardiness 6 Makespan 37 Average WIP 2.2702702703 CR Job time Due date CR 0A Job
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: (days) (days) A 14 20 1.42857143 B 10 16 1.6 C 7 15 2.14285714 D 6 17 2.83333333 14C A B 10 16 0.2 C 7 15 0.14285714 D 6 17 0.5 21 B 10 16-0.5 C D 6 17-0.6666667 D B 10 16 B A 14 14 20 C 7 21 15 6 D 6 27 17 10 B 10 37 16 21 37 99 68 37 Average FT 24.75 Average Tardiness 9.25 Makespan 37 Average WIP 2.6756756757...
View Full Document

Ask a homework question - tutors are online