1 The Eli Broad College of Business, Michigan State University, 2011 Managing Processes and Capabilities Managing Processes and Capabilities
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
2 The Eli Broad College of Business, Michigan State University, 2011 A system of structured activities that use resources to turn inputs into valuable outputs . Process thinking views activities in an organization as a collection of processes What is a process?
Background image of page 2
3 The Eli Broad College of Business, Michigan State University, 2011 Managers Deal With Many Processes Innovation Procurement Manufacturing Order fulfillment Accounts Payable Hiring Etc.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
4 The Eli Broad College of Business, Michigan State University, 2011 Thinking About Resources: Things Used to Perform Process Activities People Machines Space Brainpower etc.
Background image of page 4
5 The Eli Broad College of Business, Michigan State University, 2011 Capacity is Simple-But Complex Every Resource and Every Activity and Process in the Supply Chain has a “Capacity” Machines Labor Land/Buildings Production lines Vehicles Etc. In general, “Capacity” is nothing more than the maximum output of a process or a resource in a period of time. However, sometimes it is thought of as the amount of a resource that is available (an input measure).
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
6 The Eli Broad College of Business, Michigan State University, 2011 Process Capacity Definitions Maximum capacity : highest achievable level under ideal conditions, for a limited time Capacity cushion is the difference between the maximum capacity and the effective capacity, usually, but not always, stated as a percentage. Effective capacity : achievable level under normal conditions, for an extended time Utilization : how much available capacity is actually used Yield : usable output from input-for the time being, we will assume that yield is 100%. 3– 3– 6
Background image of page 6
7 The Eli Broad College of Business, Michigan State University, 2011 Longer-term Resource Capacity Planning The question to be answered is basically: “How much (or how many) of each resource will we need To answer the question, you have to consider how much needs to be produced and how much one resource can produce, The answer becomes more complicated when a resource is used to produce more than one type of thing. Then you have to consider switchover/setup times
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
8 The Eli Broad College of Business, Michigan State University, 2011 Resource Planning Calculating resource needs: Resources required = Total Resource Demands Effective Capacity of 1 resource
Background image of page 8
9 The Eli Broad College of Business, Michigan State University, 2011 A Simple Strategic Capacity Problem A copy shop estimates demand to be 20 million pages per year of copies. The store is open 3,000 hours per year. If each machine can copy 720 pages per hour and the store wants to maintain a 20% cushion, how many copy machines should the store have?
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
10 The Eli Broad College of Business, Michigan State University, 2011
Background image of page 10
Image of page 11
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 31

Chapter_3_Managing_Processes_and_Capabil - Managing...

This preview shows document pages 1 - 11. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online