Cp61010 - ECE 3331 SPRING 2010 SEMESTER PROJECT 6 MULTISTAGE EXTRACTION PROCESS ANALYSIS SOLUTION FOR SAMPLE DATA For Data Set No 1 NUMBER OF

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
ECE 3331 - SPRING 2010 SEMESTER - PROJECT 6 MULTISTAGE EXTRACTION PROCESS ANALYSIS SOLUTION FOR SAMPLE DATA For Data Set No. 1 NUMBER OF STAGES: 5 DISTRIBUTION COEFFICIENT: 5. FLOWRATE F1: 500. FLOWRATE F2: 750. WEIGHT FRACTION YIN: 0.100000001 WEIGHT FRACTION XIN: 0. COEFFICIENT MATRIX: ------------------------------------------ -8.5 7.5 0. 0. 0. 1. -8.5 7.5 0. 0. 0. 1. -8.5 7.5 0. 0. 0. 1. -8.5 7.5 0. 0. 0. 1. -8.5 _________________________________________ RIGHT-HAND-SIDE VECTOR: ----------------------------------------- -0.100000001 0. 0. 0. 0. The solution is given by: Y X 0.0133328466 0.0666642338 0.00177722599 0.0088861296 0.000236476524 0.00118238258 3.10432479E-05 0.000155216243 3.65214646E-06 1.82607328E-05 In particular, yout= 3.65214646E-06 and xout= 0.0666642338 *************************************** For Data Set No. 2 NUMBER OF STAGES: 8 DISTRIBUTION COEFFICIENT: 7. FLOWRATE F1: 1000. FLOWRATE F2:
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/26/2011 for the course ECE 3331 taught by Professor Staff during the Fall '08 term at University of Houston.

Page1 / 2

Cp61010 - ECE 3331 SPRING 2010 SEMESTER PROJECT 6 MULTISTAGE EXTRACTION PROCESS ANALYSIS SOLUTION FOR SAMPLE DATA For Data Set No 1 NUMBER OF

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online