Business Calc Homework w answers_Part_57

Business Calc Homework w answers_Part_57

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: .3 0.3285 2.2 3.7333 0.4 0.4568 2.1 4.5268 0.5 0.5946 2.0 5.2840 0.6 0.7418 1.9 5.9686 0.7 0.8986 1.8 6.5456 0.8 1.0649 1.7 6.9831 0.9 1.2411 1.6 7.2562 1.0 1.4273 1.5 7.3488 1.1 1.6241 1.4 7.2553 1.2 1.8319 1.3 6.9813 1.3 2.0513 1.2 6.5430 1.4 2.2832 1.1 5.9655 1.5 2.5285 1.0 5.2805 1.6 2.7884 1.7 3.0643 1.8 3.3579 1.9 3.6709 2.0 4.0057 x x 41. To estimate y (3), set y1 initial values x 0 and y points. This gives y (3) 1 and step size 0.05 for 60 0.9063. 42. To estimate y (4), set y1 with initial values x x2 2y x 1 and y 60 points. This gives y (4) 43. Set y1 e (x x 0 and y 2y and use IMPEULT with 1 y 2) 1 and use EULERT 1 and step size 0.05 for 4.4974. and use EULERG with initial values 2 and step sizes 0.1 and 0.1. (a) [ 0.2, 4.5] by [ 2.5, 0.5]...
View Full Document

This document was uploaded on 10/31/2011 for the course MAC 2311 at University of Florida.

Ask a homework question - tutors are online