A T M PETE 661 Drilling Engineering Lesson 21 Well Control Complications
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2 A T M Well Control Complications Volumetric Well Control Lubrication Complications During Conventional Kill Techniques to Reduce Annular Friction
Background image of page 2
3 A T M HW #12 - due Dec 02, 2002 Review
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
4 A T M Gas Kick Migration While a well is shut in the casing pressure increase by 1,040 psi in 2 hours. Mud Weight = 10 lb/gal How fast is the kick migrating?
Background image of page 4
5 A T M Gas Kick Migration How fast is the kick migrating? X ft = ? 0.052 * 10 * X = 1,040 psi X = 2,000 ft (in 2 hrs.) Migration rate = 1,000 ft/hr p p + 1,040
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
6 A T M Volumetric Well Control Non-Circulating method of well control. Allows a gas bubble to migrate to the surface while systematically allowing the bubble to expand. It also maintains the BHP at or above formation pressure Used whenever circulation cannot be used to kill the well.
Background image of page 6
7 A T M Two situations can be present Drillpipe can be used to monitor pressure Drillpipe cannot be used
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
8 A T M Drillpipe can be used When Bit is on bottom Bit is not plugged No float in drillstring
Background image of page 8
9 A T M Drillpipe can be used Procedure Determine a safety margin for the casing pressure (usually 50 - 100 psi above initial stabilized SICP and SIDPP) Determine working margin (50 - 100 psi above safety margin) As bubble migrates, casing pressure will eventually reach the safety margin
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
A T M Drillpipe can be used Procedure Allow the casing pressure to reach the upper limit of the working margin Very slowly bleed a small volume of mud from the annulus (approximately 1/4 bbl) into a calibrated tank. Then close the choke. Let Drillpipe pressure “stabilize”
Background image of page 10
Image of page 11
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 10/30/2011 for the course PETROLEUM 661 taught by Professor Dr.jeromej.schubert during the Fall '11 term at Texas A&M University-Galveston.

Page1 / 65

21.Well Control Complications - PETE 661 Drilling...

This preview shows document pages 1 - 11. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online