Exam 2 Study Guide

Exam 2 Study Guide - Chapter 5 Plantwide Plantwide OH Rate = Estimated Annual Overhead Estimated Annual Activity Plantwide OH Rate Actual Activity

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Chapter 5 Plantwide : Plantwide OH Rate = Estimated Annual Overhead Estimated Annual Activity Plantwide OH Rate * Actual Activity Level = Applied OH Department : Departmental OH Rate = Estimated Departmental Annual Overhead Estimated Departmental Annual Activity Departmental OH Rate * Actual Departmental Activity Level = Applied OH in Department Watch for : 1. Correct activity driver (DL hrs. vs Machine hrs.) varies per department 2. Apply correct departmental OH rate to matching actual activity hrs. (Ex. Assembly Dept. driven by DL hrs . Assem. OH Rate X Actual DL hrs . in Assem.) Actual vs Applied OH : Actual > Applied ------> Under applied: ADD variance to COGS Actual = Applied ------> Same Actual < Applied ------> Over applied: SUBTRACT variance from COGS Actual OH Actual OH - Applied OH - Applied OH + Variance Under applied (Variance) Over applied Unit Product Cost : DM per unit +DL per unit +Applied OH per unit [OH Rate * Actual Hrs. per unit] = Unit Product Cost Unit Product Cost
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This document was uploaded on 11/01/2011 for the course ACC 222 at Miami University.

Page1 / 2

Exam 2 Study Guide - Chapter 5 Plantwide Plantwide OH Rate = Estimated Annual Overhead Estimated Annual Activity Plantwide OH Rate Actual Activity

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online